Local News
Winona Bridge Right On Schedule
The Highway 43 Winona bridge project with includes plans to rehabilitates the
existing bridge and build a new permanent bridge immediately upstream of the existing bridge. The DOT’s MIke Doughtery says things are still on schedule to start construction in July.
Total cost for construction is between $150 million to $175 million.
![](https://www.wizmnews.com/wp-content/uploads/2024/08/WIZMnews600top.png)